Analysis and Summary of Common Construction Issues in PV Power Plants发表时间:2025-06-27 08:13 With the increasing maturity of solar power generation technology, photovoltaic (PV) systems are being applied more widely. Building safe and efficient PV power plants hinges on high-quality construction. Based on recent field maintenance and accumulated experience, this edition focuses on analyzing and summarizing common issues encountered during PV construction, providing references for standardized practices. I. Classification and Analysis of Common Issues 1. Component Installation Issues Component Damage: Stepping on panels or placing heavy objects during construction can easily cause cell micro-cracks, potentially leading to panel breakage or failure in severe cases. Additionally, improperly secured PV cables can suffer abrasion and insulation damage due to friction. Connection Hazards: Loose mating of string connectors is a primary risk factor for inducing DC arcing. Improper Clamp Installation: Using a single clamp to secure two panels (each panel should be independently fixed at both ends). Failure to replace corroded clamp washers promptly. Clamps placed crookedly, offset, or causing uneven pressure distribution, leading to localized stress points on panels. Clamp bolts used without spring washers or inadequately tightened. Improper Siting: Installation in areas with severe shading or pollution is strictly prohibited. If site obstacles deviate from the design drawings, immediate communication with the design team for plan adjustment is essential. 2. Cable Construction Issues DC-Side Issues (High Incidence, High Risk): Connector Cross-Mating: Differences in specifications, dimensions, and tolerances between connectors from different manufacturers can lead to increased contact resistance, abnormal temperature rise, and compromised ingress protection (IP) ratings when forcibly mated, significantly impacting plant efficiency and safety (ranked among the top three failure causes in TÜV Rheinland FMEA assessments). Improper MC4 Plug Termination: Dedicated crimping tools must be used; pliers or side cutters are strictly prohibited to ensure secure and reliable connections. Cable Routing and Management: Failure to strictly distinguish positive and negative cables using red/black colors or to install sleeve markers labeled "+" and "-", increasing the risk of polarity reversal. Cables and connectors left loose or hanging, not secured to the mounting structure or panel backsheet, increasing damage risk. Exposed cable runs lacking conduit protection or cable trays, where physical damage can cause insulation breaches, posing safety hazards. AC-Side Issues: Incorrect Cable Selection: Failure to strictly adhere to cable specifications recommended in inverter and other equipment manuals. Improper Termination: Incorrect stripping length, insufficient contact area between terminal and conductor core, failure to tighten terminals to the torque specified in manuals (e.g., models like G6-GR1P(7-8)K2 have clear requirements). Insufficient Routing Management: Similar to DC side, issues include inadequate cable securing and protection. 3. Inverter Construction Issues Improper Location: Installation in damp, poorly ventilated, direct sunlight exposed areas, or environments prone to vibration, instead of suitable locations like outdoor walls, rooftops, or equipment rooms. Insecure Mounting: Undersized or unstable mounting brackets can cause the inverter to tilt or sway under wind load or other forces. Inadequate Safety Clearance: Insufficient distance from surrounding equipment or structures, lack of protective measures, increasing risk of accidental contact or safety hazards, and failure to effectively prevent sun exposure or snow/rain accumulation. Cable Stress Impact: Failure to account for the inherent spring force/stress of AC cables during installation can lead to terminal loosening or detachment over time. 4. Other Critical Construction Issues Lack of Grounding & Lightning Protection: Failure to install effective bonding jumpers between panels, between panels and cable trays, or at inverters/other equipment as required, creating significant electrical safety hazards. Special attention to the grounding specifics of PV arrays and inverters is crucial, especially in commercial & industrial (C&I) projects. Oversights in Project Closeout: Debris left above/below panels not cleared, affecting aesthetics and potentially causing shading (hot spots) or even fire hazards (e.g., cardboard, plastic film).
Failure to identify and address waterproofing and drainage issues (e.g., blocked drainage holes, roof damage). Unsealed Critical Penetrations: Failure to effectively seal openings using fire-stop putty at locations like cable tray/conduit entries, combiner box cable entries, and conduit entry/exit points. II. Summary Standardized construction is fundamental to ensuring the safe, efficient, and long-lasting operation of PV power plants. This article systematically reviews common construction problems and their potential risks, focusing on core aspects: component installation, cable routing (DC and AC sides), inverter installation, grounding & lightning protection, and project closeout. Through in-depth analysis of these issues, it aims to deliver clear standardized guidelines for PV practitioners, promoting continuous improvement and standardization of construction practices. Ultimately, this safeguards the long-term stable operation of power plants, maximizing power generation and return on investment. |